1·The actuality and method of short-term cascaded hydropower plants optimal generation dispatching.
短期优化调度的国内外研究现状和方法介绍。
2·The optimal operation of cascaded hydropower plants is researched in generation market, and an improved network flow algorithm is proposed.
研究了在发电侧电力市场中梯级水电站的优化运行问题,提出了改进的网络流优化算法。
3·In this paper, we discuss a mathematical mode for optimization of active power dispatch of large-scale hydro-thermal power systems with cascaded hydropower stations.
讨论了含梯级水电站的大型水火电力系统有功功率最优分配的数学模型,考虑了水电厂上、下游水位的变化、梯级水电厂间的水流时间延迟等因素。
4·In electric power market, the common agent mechanism designed appropriately can resolve many problems effectively such as how do cascaded hydropower station enter the market.
在电力市场中,设计合理的共同代理机制可以为梯级水电进入市场等问题提供一种新的解决思路。
5·In this paper, the deterministic model of cascaded hydropower station optimal scheduling is compared with the stochastic model, and the deterministic model is mainly researched.
文中比较了梯级水电优化调度的确定性模型和随机模型,并着重探讨了确定性模型。